Aluminium, adrenaline and the people who work above everyone else’s head.
The rig is the skeleton of every production. It holds the lights, the speakers, the screens and, in a very real sense, the trust of everyone below it. This is a story from the riggers, the crew members who climb into the steel before anyone else arrives and descend after everyone else has gone home. It is a story of truss, tears and quiet triumph.
The Skeleton of the Show
The modern touring truss traces its roots to the geodesic ideas of Buckminster Fuller and the engineering of aluminium space frames. By the 1970s, companies such as Tomcat, Thomas Engineering and James Thomas Engineering were producing lightweight, modular trusses that could be bolted together in minutes. The box truss and triangular truss became the standard shapes, joined by conical couplers and half-conical connectors.
Chain motors from Columbus McKinnon (CM Lodestar), Verlinde, Chain Master and Prolyft lifted these structures into the air. Sophisticated motion control systems from Kinesys, Movecat and Stage Technologies allowed riggers to choreograph moving trusses and flying scenery. In the hands of a skilled crew, a rig is a ballet of steel.
The Gig
The show was an arena tour with a massive lighting and video rig: a forty-metre main truss, six motorised pods, two LED wings and a moving centrepiece shaped like a halo. The head rigger, a veteran named Gus with thirty years in the trade, had a reputation for caution. He carried a worn notebook filled with load calculations and a laminated card reading “Check, check, and check again.”
The rig was designed by a structural engineer and drawn in Vectorworks Braceworks, a plugin that calculates loads and deflections. The plan called for sixty-four one-tonne motors, a set of steel spreader bars and a series of bridle points attached to the venue’s roof steel. Every item was tagged, certified and logged.
The First Tears
Load-in began at six in the morning. The riggers climbed into the grid, clipped on harnesses and began hanging motors. By nine, a problem emerged. The venue’s roof steel, supposedly rated for the planned loads, showed signs of corrosion on one beam. A small patch of rust had eaten into the flange.
Gus inspected it, frowned and called the venue’s engineer. After a tense hour, the engineer confirmed that the beam’s rating was lower than the venue’s drawings claimed. Two of the planned pick points had to be moved. The riggers began the painstaking task of redesigning the load distribution.
There were, quite literally, tears. A young rigger, on his first tour, wept quietly in frustration, convinced he had caused the delay. Gus put a hand on his shoulder and said, “You caught the rust. You did exactly what we hired you for.” The young man nodded, wiped his eyes and went back to work.
- Always request structural certification for the venue’s roof steel.
- Inspect beam flanges, bolts and beam clamps visually before loading.
- Use load-rated hardware from certified suppliers only.
- Never rely on a venue’s drawings without on-site verification.
A Short History of Rigging Safety
The industry’s safety culture was forged in tragedy. Over the decades, collapses at concerts and festivals killed performers and fans alike, prompting new standards and a stronger emphasis on training. In North America, the ANSI E1.21 standard on temporary structures and the ETCP certification program for rigging professionals emerged from this history. In the United Kingdom, the PLASA and the Health and Safety Executive published guidelines for entertainment rigging.
These standards require safety factors, typically ten to one for hardware and five to one for motors, meaning that a component’s breaking load must be many times its working load. It is a conservative approach, born of hard lessons.
The Second Crisis: A Motor Dies
By noon, the new rig plan was approved, and the riggers resumed. As the main truss climbed, a motor on the left side stalled. A thin wisp of smoke curled from its housing. The riggers hit the emergency stop, and the truss hung, motionless, forty feet above the stage.
This was the moment that tests a rigging crew. The truss was suspended by the remaining motors, which were now bearing extra load. Gus calmly redistributed the weight by adjusting the motor controller, then ordered a secondary steel to be attached as a safety. The team lowered the truss slowly, and the failed motor was replaced with a spare.
A postmortem revealed that a limit switch had malfunctioned, causing the motor to overrun. The crew replaced the entire motor bank’s limit switches, and Gus filed an incident report with the manufacturer.
Technique: The Secondary Safety System
Every professional rig uses secondary suspension, a backup system that holds the load if the primary fails. Typical secondaries include steel wire rope slings, chain, and load-rated shackles. The secondary is slack under normal operation, but it will catch the load if the primary fails.
Gus insisted on a double-redundant system for any item flown over people. Each motor had a safety bridle. Each truss had a secondary cable. Each lighting fixture had a safety cable clipped to the truss. These small cables cost pennies compared to the consequences of a falling fixture.
He also used load monitoring software from LiftLoc and Kinesys to track the weight on each motor in real time. A sudden spike or drop would trigger an alarm, giving the crew early warning of trouble.
- Attach a safety cable to every fixture, rated to the fixture’s weight.
- Use load cells to monitor critical lifts.
- Inspect motors, chains and hooks daily during a tour.
- Maintain a rigging log for every piece of equipment.
The Third Test: The Halo
The most delicate challenge was the halo, a circular truss that rose and rotated above the stage, carrying a cluster of lights and screens. Its movement was programmed in Kinesys Vector, with positions synchronised to the music via timecode.
During the afternoon test, the halo began to drift off its path. A cable had snagged, and the motion controller, unaware, compensated by increasing speed on one side. The halo tilted slightly. The riggers froze, hands on emergency stops. Gus, watching the load readouts, called a halt.
They lowered the halo, found the snagged cable and rerouted it. A second test ran flawlessly. By evening, the halo moved like a slow-motion planet above the stage, and the crew allowed themselves a cheer.
The Triumph
When the show began, the audience saw a spectacle. They saw lights swirling, screens glowing and a halo rotating in the dark. They did not see the sweat, the stress or the quiet determination of the riggers. In the wings, Gus stood with his arms folded, watching the rig in silence. A fan, backstage with a pass, asked him what he did. “I make sure nothing falls,” he said.
The young rigger who had cried that morning stood nearby, grinning. He had learned the most important lesson of the trade: that vigilance is not a burden, but a form of care. The show went off without a hitch, and the rigging crew received a standing ovation from the production team at the end of the night.
Business Insights: The Value of Trust
Rigging is a business built on trust. Clients trust the crew to keep people safe. Venues trust the crew to respect their buildings. Insurers trust the crew to follow standards. A single failure can destroy that trust and bankrupt a company.
Smart production companies invest heavily in rigging. They hire ETCP-certified riggers, pay them fairly and give them the authority to stop a show. They buy high-quality hardware and replace it on schedule. They carry comprehensive insurance and document every inspection.
This investment pays back in reduced risk, lower premiums and a reputation for reliability. Clients, especially in corporate and broadcast markets, increasingly ask for proof of rigging credentials. A company that can produce them wins contracts.
The Quiet Heroes
The rig rarely gets applause. But in the culture of production, riggers are revered. They work early, they work high and they work with a seriousness that borders on devotion. The crew calls them “the guardians of the sky.”
Gus retired two years later, handing his worn notebook to the young rigger who had cried. On the first page, he had written: “Truss is just metal. Trust is what holds it up.”
The Takeaway
Truss, tears and triumph form the triangle of rigging life. The truss gives structure. The tears remind us that stakes are real. The triumph is the quiet satisfaction of a show that stays in the air. Respect the steel, check the load and remember that every light, every screen and every performer under the rig is relying on someone who climbed the ladder first.